Giàn giáo kiểu Build-Up

Thông tin đang chờ cập nhật

Thông tin sản phẩm Giàn giáo kiểu Build-Up

• At the construction site, this ‘Build-up type (B/T) Scaffolding’ is easy to install and is made for installation, demolition, painting, welding and other operations.

Precautions for Use

1. Be careful not to get Horizontal loads and shock loads

2. Do not climb and come down more than two people at the same time in the same workbench

3. Do not move when operator in the State of ride

    4. Except when moving, the wheel brakes should always lock

5. Mounting on a Tri-angle fixed-base to the ground at the time 0f installation and be sure to adhere to the ground of  fixing  jacky

6. Be sure install the Tri-angle fixed-base when it is installed more than 4  stairs

  Quantity Catculation Chart

Order Code

Parts Name

1 stair

1M650

2 stair

3M650

3 stair

4M650

4 stair

6M150

30054201

Vertical support

2

4

6

8

30054202

Horizontal support

1

1

1

2

30054203

Diagonal blacing

2

4

6

8

30054101

Linear Joint

4

8

12

16

30054401

Caster (Wheel)

4

4

4

4

30053203

30024504

Walking panel

2

2

2

2

Vertical  Handrail pole

2

2

2

2

30054208

Horizontal Handrail bar

4

4

4

4

30054205

Stopper (Fixed-base)

-

-

-

4

 
 
Bấm Gọi0974.953.338
Top